Posts by Natasha Hoare
Berkshire – Courthouse Junior School
Courthouse is a 10:10 Solar Schools school so staff and pupils had already shown their commitment to a sustainable future by raising money to contribute towards their panels. Joining the Schools’ Energy Co-operative allowed the school to increase the size of the array which was installed. “At Courthouse Junior School we work hard to put…
Read MoreLocal Power Plan Promises Boost for the Community Energy Sector
The government has announced a major boost for the community energy sector through GB Energy’s new Local Power Plan. The Plan commits up to £1 billion of investment through grants, loans and advice to accelerate the growth of clean power that benefits communities. Schools’ Energy Co-op welcomes the move – we have more than 10…
Read MoreMapping our member schools
For the first time, we have mapped the locations and capacities (in kilowatts) of our solar PV installations on member schools and buildings – that’s over 100 installations. You can find all the information on our Projects Page. The sites are divided by county, or by borough in the case of London where we have…
Read MoreWiltshire College – Salisbury Campus
Location: Salisbury Type of site: Secondary & Sixth Form School Capacity: 58.9 kW (49.8 kW and 9.1 kW installations) Year of installation: 2020 Installer: Joju Solar Estimated annual generation: 46,833 kWh
Read MoreWiltshire College – Trowbridge Campus
Location: Salisbury Type of site: Secondary & Sixth Form School Capacity: 159.9 (125 kW and 35.2 kW installations) Year of installation: 2023 Installer: Joju Solar Estimated annual generation: 138,279 kWh
Read MoreWiltshire College: Lackham Campus
Location: Wiltshire Type of site: College & University Capacity: 226.2 kW spread across 6 sites on Lackham Campus Year of installation: 2023 and 2024 Installer: Joju Solar Estimated annual generation: 182,655 kWh
Read MoreKong Company Units
Location: Salisbury Type of site: Commercial Building Capacity: 49.9 kW Year of installation: 2019 Installer: Joju Solar Estimated annual generation: 46,284 kWh
Read MoreSt Martin’s CofE School
Location: Salisbury Type of site: Primary School Capacity: 30 kW Year of installation: 2019 Installer: Joju Solar Estimated annual generation: 26,089 kWh
Read MoreBishop Wordsworth’s School
Location: Salisbury Type of site: Secondary & Sixth Form School Capacity: 30 kW Year of installation: 2020 Installer: Joju Solar Estimated annual generation: 28,170 kWh
Read MoreSalisbury Cathedral
Location: Salisbury Type of site: Church Capacity: 36.8 kW Year of installation: 2020 Installer: Joju Solar Estimated annual generation: 33,708 kWh News post: Installation of 93 solar panels on Salisbury Cathedral
Read More