Longspee Academy

Location: Poole Type of site: Special Education School Capacity: 30 kW Year of installation: 2017 Installer: Joju Solar Estimated annual generation: 28,381 kWh

Read More

Rudheath Senior Academy (UCAN)

Location: Rudheath Type of site: Secondary School Capacity: 28.9 kW (13.3 kW on west side, 15.6 kW on east side) Year of installation: 2016 Installer: Joju Solar Estimated annual generation: 23,780 kWh

Read More

Kings School (The Cathedral)

Location: Peterborough Type of site: Junior to Sixth Form school Capacity: 49 kW (17 kW on north side, 32 kW on south side) Year of installation: 2020 Installer: Joju Solar Estimated annual generation: 38897 kWh

Read More

Middleton Primary School

Location: Milton Keynes Type of site: Primary School Capacity: 29.2 kW (two 14.6 kW installations on back/north and front/south rooftops) Year of installation: 2016 Installer: Joju Solar Estimated annual generation: 24955 kWh

Read More

Bayside Academy

Location: Turlin Moore, Poole Type of site: Primary school Capacity: 49.8 kW Year of installation: 2019 Installer: Joju Solar Estimated annual generation: 46240 kWh

Read More

Ashlyn’s School Berkhamsted

Location: Berkhamsted, Hertfordshire Type of site: Secondary & Sixth Form school Capacity: 49.9 kW Year of installation: 2015 Installer: Joju Solar Estimated annual generation: 37,190 kWh News about the site: Schools’ Energy Co-op Welcomes New School

Read More

Why don’t all schools in the UK already have solar panels?

This post was originally published on the Energy4All website. At present only around 20% of UK schools have solar panels, even though the renewable technology appears to be an easy win for its ability to save schools money long-term whilst cutting their environmental impact. The British public are overwhelmingly in support of solar panels on…

Read More